IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0617 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $463 $378 Not Implemented
CO0741 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $48,927 $491,439 Not Implemented
CO0741 # 02 Y:2021 02 2021 INSTALL WIND POWERED ELECTRIC GENERATOR $38,875 $547,800 Not Implemented
CO0741 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,984 $0 Implemented
CO0741 # 04 Y:2021 04 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,264 $21,000 Implemented
CO0741 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,303 $3,500 Implemented
CO0741 # 06 Y:2021 06 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,794 $0 Implemented
CO0741 # 07 Y:2021 07 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $51,454 $3,624 Implemented
CO0741 # 08 Y:2021 08 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,987 $33,250 Not Implemented
TT0259 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300,781 $111,421 Implemented
TT0259 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $62,325 $1,640 Implemented
TT0259 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,112 $13,000 Not Implemented
TT0259 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,779 $2,738 Implemented
TT0259 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,579 $16,000 Not Implemented
TT0259 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $5,951 $1,314 Not Implemented
TT0259 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,907 $5,500 Not Implemented
TT0259 # 08 Y:2021 08 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,752 $400 Not Implemented
UK2107 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,932 $3,950 n/a
UK2107 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,788 $0 n/a
UK2107 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $662 $150 n/a
UK2107 # 04 Y:2021 04 2021 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,257 $1,770 n/a
UK2107 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $2,733 $2,931 n/a
UK2107 # 06 Y:2021 06 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,085 $797 n/a
UU0190 # 01 Y:2021 01 2021 INSULATE BARE EQUIPMENT $9,772 $5,582 Not Implemented
UU0190 # 02 Y:2021 02 2021 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,939 $3,000 Not Implemented