IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0031 # 02 Y:2002 02 2002 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $38,400 $10,372 Implemented
MI0031 # 03 Y:2002 03 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $30,176 $37,105 Not Implemented
MI0031 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,898 $1,820 Not Implemented
MI0031 # 05 Y:2002 05 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $18,813 $23,000 Implemented
MI0031 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,483 $1,137 Not Implemented
MI0030 # 01 Y:2002 01 2002 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $113,786 $15 Implemented
MI0030 # 02 Y:2002 02 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $70,800 $7,140 Implemented
MI0030 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,323 $962 Not Implemented
MI0030 # 04 Y:2002 04 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,368 $4,260 Not Implemented
MI0030 # 05 Y:2002 05 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,370 $2,730 Not Implemented
UF0294 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $2,667 $654 Implemented
UF0294 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,905 $4,220 Implemented
UF0294 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,603 $14,749 Implemented
UF0294 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $651 $0 Implemented
UF0294 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $3,038 $820 Not Implemented
UF0294 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $4,538 $20,450 Not Implemented
UF0294 # 07 Y:2002 07 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,139 $18,574 Not Implemented
UF0294 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $8,307 $2,282 Not Implemented
UF0294 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,700 $7,000 Implemented
UF0294 # 10 Y:2002 10 2002 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $8,320 $32,000 Implemented
UF0294 # 11 Y:2002 11 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,880 $13,500 Not Implemented
MI0029 # 01 Y:2002 01 2002 METER WASTE WATER $73,069 $3,650 Not Implemented
MI0029 # 02 Y:2002 02 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $55,380 $42,432 Not Implemented
MI0029 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,287 $1,550 Implemented
MI0029 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,657 $2,122 Implemented