Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0289 # 03 Y:1997 | 03 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,496 | $11,150 | Not Implemented |
WI0289 # 04 Y:1997 | 04 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,349 | $22,000 | Not Implemented |
WI0289 # 05 Y:1997 | 05 | 1997 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $6,780 | $34,425 | Not Implemented |
WI0289 # 06 Y:1997 | 06 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,430 | $0 | Implemented |
WI0289 # 07 Y:1997 | 07 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,219 | $150 | Implemented |
WI0289 # 08 Y:1997 | 08 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,588 | $640 | Not Implemented |
WI0289 # 09 Y:1997 | 09 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,541 | $5,000 | Implemented |
UF0171 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,763 | $23,909 | Not Implemented |
UF0171 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $493 | $502 | Implemented |
UF0171 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,395 | $1,350 | Implemented |
UF0171 # 04 Y:1997 | 04 | 1997 | INCREASE USE OF AUTOMATION | $32,049 | $0 | Not Implemented |
UF0171 # 05 Y:1997 | 05 | 1997 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $9,000 | $0 | Implemented |
UF0171 # 06 Y:1997 | 06 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $554 | $0 | Implemented |
KU0472 # 01 Y:1997 | 01 | 1997 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $920 | $100 | Implemented |
KU0472 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $610 | $1,730 | Not Implemented |
KU0472 # 03 Y:1997 | 03 | 1997 | INSTALL OCCUPANCY SENSORS | $540 | $1,500 | Not Implemented |
KU0472 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $410 | $310 | Implemented |
KU0472 # 05 Y:1997 | 05 | 1997 | USE SYNTHETIC LUBRICANT | $320 | $310 | Implemented |
KU0472 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $480 | Implemented |
KU0472 # 07 Y:1997 | 07 | 1997 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $4,740 | $13,000 | Implemented |
KU0472 # 08 Y:1997 | 08 | 1997 | MOVE PRODUCT USING MECHANICAL MEANS | $66,490 | $21,110 | Implemented |
KU0472 # 09 Y:1997 | 09 | 1997 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $15,600 | $9,750 | Not Implemented |
MA0382 # 01 Y:1997 | 01 | 1997 | INSULATE BARE EQUIPMENT | $1,954 | $1,527 | Implemented |
MA0382 # 02 Y:1997 | 02 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,296 | $5,000 | Implemented |
MA0382 # 03 Y:1997 | 03 | 1997 | USE SOY OR WATER-BASED INKS | $240,201 | $300,000 | Not Implemented |