IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0382 # 04 Y:1997 04 1997 USE OTHER METHODS FOR NEUTRALIZATION $457,830 $754,000 Not Implemented
MA0382 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,752 $13,700 Not Implemented
MA0382 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,713 $200 Implemented
HO0145 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,073 $6,276 Not Implemented
HO0145 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $327 $1,433 Not Implemented
HO0145 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $661 $500 Implemented
HO0145 # 04 Y:1997 04 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,805 $17,760 Not Implemented
HO0145 # 05 Y:1997 05 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,170 $500 Not Implemented
HO0145 # 06 Y:1997 06 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $10,296 $10,000 Not Implemented
DS0079 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,837 $15,866 Not Implemented
DS0079 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $161 $260 Implemented
DS0079 # 03 Y:1997 03 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,071 $6,000 Not Implemented
DS0079 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,040 $4,750 Not Implemented
DS0079 # 05 Y:1997 05 1997 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $5,732 $7,500 Implemented
DS0080 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,720 $12,717 Implemented
DS0080 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $3,281 Implemented
DS0080 # 03 Y:1997 03 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,856 $2,388 Not Implemented
DS0080 # 04 Y:1997 04 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $39,032 $2,500 Not Implemented
DS0080 # 05 Y:1997 05 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,150 $1,100 Implemented
DS0080 # 06 Y:1997 06 1997 RECOVER AND REUSE WASTE MATERIAL $48,600 $25,000 Not Implemented
DS0080 # 07 Y:1997 07 1997 INCREASE USE OF AUTOMATION $592,801 $1,500,000 Not Implemented
MS0077 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $588 $1,171 Not Implemented
MS0077 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $291 $315 Not Implemented
MS0077 # 03 Y:1997 03 1997 SHUT OFF PILOTS IN STANDBY EQUIPMENT $480 $20 Implemented
MS0077 # 04 Y:1997 04 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,418 $0 Not Implemented