IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1902 # 11 Y:2019 11 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $122 $0 n/a
NL0030 # 01 Y:2019 01 2019 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $12,000 $102,830 Not Implemented
NL0030 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,716 $22,557 Implemented
NL0030 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $421 Implemented
NL0032 # 01 Y:2019 01 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,146 $40,000 Not Implemented
NL0032 # 02 Y:2019 02 2019 USE ULTRASONIC CLEANING $13,380 $15,575 Implemented
NL0032 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126 $500 Implemented
AM0776 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $46,030 $25,900 Not Implemented
AM0776 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,200 $60,000 Implemented
AM0776 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,400 $2,000 Implemented
AM0776 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,155 $38 Implemented
AM0776 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,244 $0 Implemented
AM0776 # 06 Y:2019 06 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $440 $100 Implemented
SU0478 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,670 $260 Not Implemented
SU0478 # 02 Y:2019 02 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $468 $253 Not Implemented
SU0478 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,685 $1,302 Not Implemented
SU0478 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $528 Implemented
SU0478 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,130 $1,973 Not Implemented
SU0478 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,321 $75,548 Implemented
SU0478 # 07 Y:2019 07 2019 OPTIMIZE PLANT POWER FACTOR $29,408 $113,315 Not Implemented
IP0116 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $308 $0 Implemented
IP0116 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,151 $23 Not Implemented
IP0116 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $415 $680 Not Implemented
IP0116 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,878 $14,599 Implemented
IP0116 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $117,376 $1,431,096 Implemented