IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0225 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $8,616 $500 Implemented
KU0225 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $13,017 $8,000 Implemented
KU0225 # 04 Y:1987 04 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $115 $0 Implemented
KU0225 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $942 $0 Implemented
KU0225 # 06 Y:1987 06 1987 INSTALL AUTOMATIC STACK DAMPER $1,432 $300 Not Implemented
KU0225 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $713 $50 Implemented
KU0225 # 08 Y:1987 08 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,280 $800 Not Implemented
KU0225 # 09 Y:1987 09 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $388 $400 Not Implemented
KU0225 # 10 Y:1987 10 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $115 $161 Implemented
KU0225 # 11 Y:1987 11 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,035 $0 Implemented
KU0225 # 12 Y:1987 12 1987 IMPROVE LUBRICATION PRACTICES $6,161 $4,500 Not Implemented
KU0226 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,452 $2,376 Not Implemented
KU0226 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $5,171 $1,302 Implemented
KU0226 # 03 Y:1987 03 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,580 $10,000 Not Implemented
KU0226 # 04 Y:1987 04 1987 INSTALL AUTOMATIC STACK DAMPER $2,690 $700 Not Implemented
KU0226 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,193 $1,370 Implemented
KU0226 # 06 Y:1987 06 1987 REPAIR AND ELIMINATE STEAM LEAKS $1,707 $300 Implemented
KU0226 # 07 Y:1987 07 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,496 $3,000 Not Implemented
KU0226 # 08 Y:1987 08 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,166 $3,000 Not Implemented
KU0226 # 09 Y:1987 09 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,121 $0 Implemented
KU0226 # 10 Y:1987 10 1987 IMPROVE LUBRICATION PRACTICES $782 $1,875 Not Implemented
KU0226 # 11 Y:1987 11 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $422 $1,600 Not Implemented
KU0226 # 12 Y:1987 12 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $204 $0 Not Implemented
KU0226 # 13 Y:1987 13 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $170 $0 Not Implemented
KU0226 # 14 Y:1987 14 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $136 $0 Implemented