Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,990
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0711 # 03 Y:2005 | 03 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $113,328 | $400,000 | Not Implemented |
UD0711 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,341 | $80,215 | Not Implemented |
UD0711 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,813 | $2,025 | Implemented |
UD0711 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,651 | $1,240 | Implemented |
UD0711 # 07 Y:2005 | 07 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $4,427 | $600 | Not Implemented |
UD0711 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $1,305 | $3,530 | Implemented |
UM0274 # 01 Y:2005 | 01 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,936 | $135,000 | Not Implemented |
UM0274 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,622 | $2,000 | Not Implemented |
UM0274 # 03 Y:2005 | 03 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,242 | $0 | Implemented |
UM0274 # 04 Y:2005 | 04 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,966 | $200 | Not Implemented |
UM0274 # 05 Y:2005 | 05 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,699 | $700 | Not Implemented |
UM0274 # 06 Y:2005 | 06 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $791 | $2,000 | Not Implemented |
UM0272 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,828 | $1,000 | Implemented |
UM0272 # 02 Y:2005 | 02 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,313 | $3,000 | Not Implemented |
UM0272 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,631 | $300 | Implemented |
UM0272 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,459 | $5,009 | Not Implemented |
UD0709 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,133 | $0 | Not Implemented |
UD0709 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,549 | $34,600 | Not Implemented |
UD0709 # 03 Y:2005 | 03 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $13,847 | $40,000 | Not Implemented |
UD0709 # 04 Y:2005 | 04 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,529 | $0 | Implemented |
UD0709 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $3,977 | $4,500 | Implemented |
UD0709 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,708 | $3,213 | Not Implemented |
UD0708 # 01 Y:2004 | 01 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $625,410 | $325,000 | Not Implemented |
UD0708 # 02 Y:2004 | 02 | 2004 | DISCONNECT BALLASTS | $53,161 | $3,105 | Implemented |
UD0708 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,575 | $35,400 | Not Implemented |