IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,612

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0153 # 04 Y:2000 04 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $826 $0 Implemented
BD0153 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $235 Not Implemented
BD0153 # 06 Y:2000 06 2000 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $1,494 $4,825 Not Implemented
BD0153 # 07 Y:2000 07 2000 MODIFY MATERIAL APPLICATION METHODS $1,171 $1,500 Implemented
BD0153 # 08 Y:2000 08 2000 $7,644 $7,000 Not Implemented
WI0364 # 01 Y:2000 01 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $20,162 $0 Implemented
WI0364 # 02 Y:2000 02 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,614 $15,000 Not Implemented
WI0364 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,918 $20,750 Not Implemented
WI0364 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,730 $740 Not Implemented
WI0364 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $90 Not Implemented
WI0364 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $1,567 $3,871 Not Implemented
WI0364 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $594 $438 Not Implemented
WI0363 # 01 Y:2000 01 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,774 $0 Implemented
WI0363 # 02 Y:2000 02 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,393 $0 Implemented
WI0363 # 03 Y:2000 03 2000 REPLACE CLOTH RAGS WITH PAPER TOWELS $5,263 $0 Not Implemented
WI0363 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $4,608 $0 Implemented
WI0363 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $544 $0 Implemented
WI0363 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,983 $12,478 Not Implemented
WI0363 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,576 $1,280 Implemented
WI0363 # 08 Y:2000 08 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,057 $100 Implemented
BD0148 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $10,397 $3,000 n/a
BD0148 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $9,788 $1,000 n/a
BD0148 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,112 $0 n/a
BD0148 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,057 $800 n/a
BD0148 # 05 Y:1999 05 1999 INSTALL OCCUPANCY SENSORS $945 $1,350 n/a