IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0219 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,778 $2,698 Implemented
KU0219 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,013 $3,814 Not Implemented
KU0219 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,516 $100 Implemented
KU0219 # 04 Y:1987 04 1987 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $498 $1,012 Implemented
KU0219 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $181 $400 Implemented
KU0219 # 06 Y:1987 06 1987 INSTALL AUTOMATIC STACK DAMPER $351 $400 Not Implemented
KU0219 # 07 Y:1987 07 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $109 $0 Implemented
KU0220 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,362 $3,200 Implemented
KU0220 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,475 $600 Not Implemented
KU0220 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $0 Implemented
KU0220 # 04 Y:1987 04 1987 COVER OPEN TANKS $756 $70 Not Implemented
KU0220 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $113 $10 Implemented
KU0221 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,984 $6,441 Implemented
KU0221 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $430 $400 Implemented
KU0221 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $6,869 $0 Not Implemented
KU0221 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $445 $145 Not Implemented
KU0221 # 05 Y:1987 05 1987 RECOVER WASTE HEAT FROM EQUIPMENT $2,605 $1,253 Implemented
KU0221 # 06 Y:1987 06 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $200 $120 Implemented
KU0221 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $273 $40 Implemented
KU0221 # 08 Y:1987 08 1987 INSTALL AUTOMATIC STACK DAMPER $328 $225 Implemented
KU0221 # 09 Y:1987 09 1987 INSULATE BARE EQUIPMENT $7,481 $3,400 Implemented
KU0221 # 10 Y:1987 10 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $1,162 $0 Implemented
KU0221 # 11 Y:1987 11 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,165 $1,100 Implemented
KU0222 # 01 Y:1987 01 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,214 $0 Implemented
KU0222 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,908 $2,400 Implemented