Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0268 # 03 Y:1997 | 03 | 1997 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $27,729 | $25,000 | n/a |
ND0268 # 04 Y:1997 | 04 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,416 | $3,000 | n/a |
ND0268 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,168 | $3,240 | n/a |
ND0268 # 06 Y:1997 | 06 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $4,500 | $4,375 | n/a |
ND0268 # 07 Y:1997 | 07 | 1997 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,126 | $6,156 | n/a |
ND0268 # 08 Y:1997 | 08 | 1997 | INSTALL OCCUPANCY SENSORS | $972 | $6,400 | n/a |
ND0268 # 09 Y:1997 | 09 | 1997 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $823 | $735 | n/a |
ND0268 # 10 Y:1997 | 10 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $495 | $260 | n/a |
ND0268 # 11 Y:1997 | 11 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $296 | $133 | n/a |
ND0268 # 12 Y:1997 | 12 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300 | $117 | n/a |
NC0108 # 01 Y:1997 | 01 | 1997 | INSTALL OCCUPANCY SENSORS | $659 | $250 | Not Implemented |
NC0108 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $405 | $1,680 | Implemented |
NC0108 # 03 Y:1997 | 03 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,625 | $8,500 | Not Implemented |
NC0108 # 04 Y:1997 | 04 | 1997 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $12,532 | $6,000 | Not Implemented |
NC0108 # 05 Y:1997 | 05 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,780 | $10,000 | Not Implemented |
NC0108 # 06 Y:1997 | 06 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $3,380 | $1,000 | Implemented |
NC0108 # 07 Y:1997 | 07 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $102,104 | $5,000 | Implemented |
NC0108 # 08 Y:1997 | 08 | 1997 | REDUCE SCRAP PRODUCTION | $31,045 | $15,000 | Implemented |
SD0163 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,513 | $12,290 | Implemented |
SD0163 # 02 Y:1997 | 02 | 1997 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,303 | $0 | Implemented |
SD0163 # 03 Y:1997 | 03 | 1997 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $27,336 | $4,000 | Implemented |
SD0163 # 04 Y:1997 | 04 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,545 | $38,000 | Implemented |
SD0163 # 05 Y:1997 | 05 | 1997 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,307 | $1,800 | Implemented |
SD0163 # 06 Y:1997 | 06 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,941 | $9,500 | Implemented |
SD0163 # 07 Y:1997 | 07 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,325 | $1,127 | Implemented |