Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0025 # 02 Y:2001 | 02 | 2001 | ELIMINATE A BY-PRODUCT | $35,000 | $100 | Not Implemented |
MI0025 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $492 | $2 | Not Implemented |
MI0025 # 04 Y:2001 | 04 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,050 | $100 | Implemented |
MI0025 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $694 | $1,778 | Implemented |
MI0024 # 01 Y:2001 | 01 | 2001 | ISOLATE HOT OR COLD EQUIPMENT | $156,000 | $10,000 | n/a |
MI0024 # 02 Y:2001 | 02 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,590 | $7 | n/a |
MI0024 # 03 Y:2001 | 03 | 2001 | ADD AREA LIGHTING SWITCHES | $2,108 | $1,000 | n/a |
MI0024 # 04 Y:2001 | 04 | 2001 | ADD AREA LIGHTING SWITCHES | $1,333 | $700 | n/a |
MI0024 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $200 | $2 | n/a |
MI0020 # 01 Y:2001 | 01 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $279,552 | $120 | Not Implemented |
MI0020 # 02 Y:2001 | 02 | 2001 | REDESIGN PROCESS | $24,074 | $13,312 | Not Implemented |
MI0020 # 03 Y:2001 | 03 | 2001 | MODIFY STARTUP/SHUTDOWN TIMES | $14,899 | $139 | Not Implemented |
MI0020 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $48,965 | $16 | Not Implemented |
MI0020 # 05 Y:2001 | 05 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,743 | $16 | Not Implemented |
MI0020 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,932 | $256 | Not Implemented |
MI0020 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,304 | $256 | Not Implemented |
UF0282 # 01 Y:2001 | 01 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,113 | $50 | Implemented |
UF0282 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,296 | $28,400 | Not Implemented |
UF0282 # 03 Y:2001 | 03 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $32,895 | $49,350 | Not Implemented |
UF0282 # 04 Y:2001 | 04 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $942 | $2,000 | Not Implemented |
UF0282 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,343 | $340 | Implemented |
UF0282 # 06 Y:2001 | 06 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,986 | $9,000 | Implemented |
UF0282 # 07 Y:2001 | 07 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $682 | $1,895 | Not Implemented |
UF0282 # 08 Y:2001 | 08 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $78,000 | $98,800 | Not Implemented |
UF0282 # 09 Y:2001 | 09 | 2001 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $35,100 | $4,494 | Implemented |