IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,315

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0360 # 02 Y:2024 02 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,851 $11,852 Not Implemented
MZ0360 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,978 $18,853 Implemented
MZ0360 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,193 $8,300 Not Implemented
DL0238 # 01 Y:2024 01 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $236,055 $1,860,000 Implemented
DL0238 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $21,276 $7,300 Implemented
DL0238 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $205,595 $34,400 Implemented
DL0238 # 04 Y:2024 04 2024 REPAIR OR REPLACE STEAM TRAPS $112,874 $37,000 Implemented
DL0238 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $40,888 $180,000 Not Implemented
DL0238 # 06 Y:2024 06 2024 REPAIR AND ELIMINATE STEAM LEAKS $56,437 $22,000 Implemented
DL0238 # 07 Y:2024 07 2024 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $212,600 $900,000 Not Implemented
SJ0018 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,066 $11,290 Not Implemented
SJ0018 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,985 $11,774 Not Implemented
SJ0018 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,691 $4,253 Not Implemented
SJ0018 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,283 $4,037 Not Implemented
SJ0018 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,414 $69 Not Implemented
SJ0018 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,365 $3,762 Not Implemented
SJ0018 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,753 $159,594 Not Implemented
WM0223 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,737 $8,466 Not Implemented
WM0223 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,472 $5,580 Not Implemented
WM0223 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,062 $994 Not Implemented
WM0223 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $971 $0 Not Implemented
WM0223 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $946 $0 Not Implemented
WM0223 # 06 Y:2024 06 2024 USE PHOTOCELL CONTROLS $406 $200 Not Implemented
WM0222 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,099 $21,586 Not Implemented
WM0222 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,848 $12,763 Not Implemented