IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0643 # 05 Y:2024 05 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,058 $4,196 Not Implemented
SD0643 # 06 Y:2024 06 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $6,190 $4,926 Not Implemented
SD0643 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $250 Implemented
SD0643 # 08 Y:2024 08 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,956 $2,000 Not Implemented
SF0609 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,048 $1,594 Implemented
SF0609 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,389 $1,640 Implemented
SF0609 # 03 Y:2023 03 2023 USE OPTIMUM THICKNESS INSULATION $1,473 $338 Implemented
SF0609 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $2,155 Implemented
SF0609 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,617 $36,367 Implemented
SF0609 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,467 $66,447 Implemented
SF0609 # 07 Y:2023 07 2023 USE OPTIMUM THICKNESS INSULATION $8,652 $21,442 Not Implemented
SF0609 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,153 $9,827 Not Implemented
SF0609 # 09 Y:2023 09 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $426,217 $1,338,900 Not Implemented
CI0023 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $78,738 $658,288 n/a
CI0023 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $45,480 $17,533 n/a
CI0023 # 03 Y:2023 03 2023 REPLACE BOILER $13,894 $30,000 n/a
CI0023 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,902 $300 n/a
CI0023 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $7,791 $2,625 n/a
CI0023 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,881 $2,299 n/a
CI0023 # 07 Y:2023 07 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,670 $7,500 n/a
CI0023 # 08 Y:2023 08 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,797 $5,000 n/a
CI0023 # 09 Y:2023 09 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $13,000 n/a
SJ0008 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,195 $77,365 Not Implemented
SJ0008 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $365 $0 Implemented
SJ0008 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $80 $0 Not Implemented