Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0643 # 05 Y:2024 | 05 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,058 | $4,196 | Not Implemented |
SD0643 # 06 Y:2024 | 06 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $6,190 | $4,926 | Not Implemented |
SD0643 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $489 | $250 | Implemented |
SD0643 # 08 Y:2024 | 08 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,956 | $2,000 | Not Implemented |
SF0609 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,048 | $1,594 | Implemented |
SF0609 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,389 | $1,640 | Implemented |
SF0609 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM THICKNESS INSULATION | $1,473 | $338 | Implemented |
SF0609 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,090 | $2,155 | Implemented |
SF0609 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $32,617 | $36,367 | Implemented |
SF0609 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,467 | $66,447 | Implemented |
SF0609 # 07 Y:2023 | 07 | 2023 | USE OPTIMUM THICKNESS INSULATION | $8,652 | $21,442 | Not Implemented |
SF0609 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,153 | $9,827 | Not Implemented |
SF0609 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $426,217 | $1,338,900 | Not Implemented |
CI0023 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,738 | $658,288 | n/a |
CI0023 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $45,480 | $17,533 | n/a |
CI0023 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $13,894 | $30,000 | n/a |
CI0023 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,902 | $300 | n/a |
CI0023 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $7,791 | $2,625 | n/a |
CI0023 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,881 | $2,299 | n/a |
CI0023 # 07 Y:2023 | 07 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,670 | $7,500 | n/a |
CI0023 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,797 | $5,000 | n/a |
CI0023 # 09 Y:2023 | 09 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,250 | $13,000 | n/a |
SJ0008 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,195 | $77,365 | Not Implemented |
SJ0008 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $365 | $0 | Implemented |
SJ0008 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $80 | $0 | Not Implemented |