IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0658 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $450 $2,400 Not Implemented
CO0657 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,210 $77,390 Not Implemented
CO0657 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $350 Implemented
CO0657 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $460 $0 Implemented
CO0657 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $510 Not Implemented
CO0657 # 05 Y:2012 05 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $2,460 $35,000 Not Implemented
CO0655 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,710 $67,190 Not Implemented
CO0655 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $590 $1,930 Not Implemented
CO0655 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,640 $21,170 Not Implemented
CO0655 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $6,090 Not Implemented
CO0655 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $2,070 Not Implemented
CO0654 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $8,050 $1,440 Implemented
CO0654 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,130 $1,990 Implemented
CO0654 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $570 $820 Implemented
CO0654 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,900 $17,990 Implemented
CO0653 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,900 $31,760 Not Implemented
CO0653 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,630 $800 Implemented
CO0653 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,230 $91,620 Not Implemented
CO0653 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,380 $25,810 Not Implemented
CO0652 # 01 Y:2011 01 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $11,990 $34,320 Implemented
CO0652 # 02 Y:2011 02 2011 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $7,570 $13,550 Not Implemented
CO0652 # 03 Y:2011 03 2011 USE SOLAR HEAT TO HEAT MAKE-UP AIR $7,530 $35,420 Not Implemented
CO0652 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $870 Implemented
CO0651 # 01 Y:2011 01 2011 CONDENSE OPERATION INTO ONE BUILDING $17,750 $20,000 Not Implemented
CO0651 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $110 Not Implemented