Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0132 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71 | $147 | Not Implemented |
IC0132 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $654 | $1,962 | Implemented |
IC0132 # 07 Y:2007 | 07 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $396 | $0 | Implemented |
IC0132 # 08 Y:2007 | 08 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $860 | $0 | Not Implemented |
UD0767 # 01 Y:2007 | 01 | 2007 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $30,284 | $1,500 | Implemented |
UD0767 # 02 Y:2007 | 02 | 2007 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $20,419 | $17,235 | Not Implemented |
UD0767 # 03 Y:2007 | 03 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $14,876 | $0 | Not Implemented |
UD0767 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,731 | $33,190 | Not Implemented |
UD0767 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,309 | $7,740 | Not Implemented |
UD0767 # 06 Y:2007 | 06 | 2007 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $2,922 | $5,000 | Not Implemented |
UD0767 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,625 | $2,175 | Implemented |
UD0767 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,139 | $5,050 | Not Implemented |
CO0607 # 01 Y:2007 | 01 | 2007 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,830 | $10,000 | Implemented |
CO0607 # 02 Y:2007 | 02 | 2007 | INCREASE EFFICIENCY OF TRUCKS | $3,780 | $0 | Not Implemented |
CO0607 # 03 Y:2007 | 03 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,590 | $10,010 | Not Implemented |
CO0607 # 04 Y:2007 | 04 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,650 | $11,000 | Not Implemented |
CO0607 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $610 | $3,710 | Not Implemented |
CO0607 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $1,710 | Not Implemented |
LE0264 # 01 Y:2007 | 01 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,680 | $50,000 | Implemented |
LE0264 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,103 | $2,500 | Implemented |
LE0264 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,204 | $2,000 | Implemented |
LE0264 # 04 Y:2007 | 04 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,727 | $2,250 | Not Implemented |
LE0264 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,084 | $500 | Implemented |
LE0264 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,514 | $200 | Not Implemented |
LE0264 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,184 | $2,500 | Implemented |