IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0627 # 07 Y:2009 07 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $5,100 $45,500 Not Implemented
CO0627 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $1,040 $2,330 Not Implemented
CO0627 # 09 Y:2009 09 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $300 $650 Not Implemented
OR0550 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $435,946 $2,900 Implemented
OR0550 # 02 Y:2009 02 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,835 $0 Implemented
OR0550 # 03 Y:2009 03 2009 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $60,786 $20,000 Not Implemented
OR0550 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,335 $11,100 Not Implemented
OR0550 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,286 $42,778 Implemented
OR0550 # 06 Y:2009 06 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,900 $12,750 Not Implemented
OR0550 # 07 Y:2009 07 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,600 $0 Implemented
OR0550 # 08 Y:2009 08 2009 UPGRADE CONTROLS ON COMPRESSORS $24,600 $7,540 Not Implemented
OR0550 # 09 Y:2009 09 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,660 $1,330 Not Implemented
OR0549 # 01 Y:2009 01 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $170,135 $100,000 Not Implemented
OR0549 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $46,600 $27,000 Not Implemented
OR0549 # 03 Y:2009 03 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,000 $700 Not Implemented
OR0549 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,682 $0 Implemented
OR0549 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $8,800 $3,500 Implemented
UM0358 # 01 Y:2009 01 2009 ISOLATE HOT OR COLD EQUIPMENT $21,998 $720 Implemented
UM0358 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,988 $23,603 Implemented
UM0358 # 03 Y:2009 03 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,994 $10,960 Not Implemented
UM0358 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,766 $1,200 Not Implemented
UM0358 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $69 $62 Implemented
UM0358 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,552 $36,000 Implemented
UM0358 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $5,125 $11,770 Implemented
TT0043 # 01 Y:2009 01 2009 Reduction $5,562 $2,500 Implemented