Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0133 # 09 Y:2014 | 09 | 2014 | REDUCE VENTILATION AIR | $1,110 | $0 | Not Implemented |
DL0133 # 10 Y:2014 | 10 | 2014 | REDUCE VENTILATION AIR | $182 | $235 | Not Implemented |
BS0043 # 01 Y:2014 | 01 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $63,855 | $15,000 | Implemented |
BS0043 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $8,916 | $19,760 | Not Implemented |
BS0043 # 03 Y:2014 | 03 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $111,915 | $69,000 | Implemented |
BS0043 # 04 Y:2014 | 04 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,411 | $5,075 | Implemented |
BS0043 # 05 Y:2014 | 05 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,508 | $17,493 | Not Implemented |
BS0043 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,075 | $429 | Implemented |
BS0043 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,042 | $52,954 | Not Implemented |
BS0043 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $2,340 | $981 | Not Implemented |
BS0043 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,381 | $7,554 | Not Implemented |
BS0043 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,014 | $1,242 | Not Implemented |
MZ0158 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,805 | $8,100 | Not Implemented |
MZ0158 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,949 | $2,100 | Not Implemented |
MZ0158 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,912 | $5,470 | Not Implemented |
MZ0158 # 04 Y:2014 | 04 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,802 | $13,500 | Not Implemented |
MZ0158 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,484 | $1,525 | Not Implemented |
AM0667 # 01 Y:2014 | 01 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,900 | $400 | Implemented |
AM0667 # 02 Y:2014 | 02 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,040 | $3,000 | Implemented |
AM0667 # 03 Y:2014 | 03 | 2014 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,380 | $249 | Not Implemented |
AM0667 # 04 Y:2014 | 04 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,670 | $550 | Implemented |
AM0667 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,300 | $2,000 | Implemented |
AM0667 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,870 | $8,750 | Implemented |
AM0667 # 07 Y:2014 | 07 | 2014 | REUSE RAGS UNTIL COMPLETELY SOILED | $2,200 | $0 | Implemented |
AM0667 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,820 | $15 | Not Implemented |