IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0016 # 05 Y:2001 05 2001 MINIMIZE WATER USAGE $6,397 $1,899 Not Implemented
MI0016 # 06 Y:2001 06 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $97,899 $585,000 Not Implemented
MI0015 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,216 $1,000 Implemented
MI0015 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,470 $208 Not Implemented
MI0015 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,746 $280 Implemented
MI0015 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,029 $0 Not Implemented
MI0015 # 05 Y:2001 05 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,179 $5,000 Implemented
MI0015 # 06 Y:2001 06 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,902 $306 Implemented
MI0015 # 07 Y:2001 07 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,176 $13 Implemented
MI0015 # 08 Y:2001 08 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,511 $13 Implemented
MI0015 # 09 Y:2001 09 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,141 $8,000 Not Implemented
MI0014 # 01 Y:2001 01 2001 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $96,925 $990 Not Implemented
MI0014 # 02 Y:2001 02 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $45,630 $0 Not Implemented
MI0014 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $9,086 $867 Implemented
MI0014 # 04 Y:2001 04 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,618 $5,000 Not Implemented
MI0014 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $661 $5 Implemented
MI0014 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,056 $20 Implemented
MI0014 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,454 $80 Implemented
MI0013 # 01 Y:2001 01 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,255 $710 Not Implemented
MI0013 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $114,000 $32,515 Not Implemented
MI0013 # 03 Y:2001 03 2001 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $3,000 $5,000 Not Implemented
MI0013 # 04 Y:2001 04 2001 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $6,641 $1,050 Not Implemented
MI0013 # 05 Y:2001 05 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $3,176 $4,500 Not Implemented
MI0013 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,000 $680 Not Implemented
MI0013 # 07 Y:2001 07 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,791 $15 Not Implemented