Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0016 # 05 Y:2001 | 05 | 2001 | MINIMIZE WATER USAGE | $6,397 | $1,899 | Not Implemented |
MI0016 # 06 Y:2001 | 06 | 2001 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $97,899 | $585,000 | Not Implemented |
MI0015 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,216 | $1,000 | Implemented |
MI0015 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,470 | $208 | Not Implemented |
MI0015 # 03 Y:2001 | 03 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $9,746 | $280 | Implemented |
MI0015 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,029 | $0 | Not Implemented |
MI0015 # 05 Y:2001 | 05 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,179 | $5,000 | Implemented |
MI0015 # 06 Y:2001 | 06 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $8,902 | $306 | Implemented |
MI0015 # 07 Y:2001 | 07 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,176 | $13 | Implemented |
MI0015 # 08 Y:2001 | 08 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,511 | $13 | Implemented |
MI0015 # 09 Y:2001 | 09 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,141 | $8,000 | Not Implemented |
MI0014 # 01 Y:2001 | 01 | 2001 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $96,925 | $990 | Not Implemented |
MI0014 # 02 Y:2001 | 02 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $45,630 | $0 | Not Implemented |
MI0014 # 03 Y:2001 | 03 | 2001 | MODIFY STARTUP/SHUTDOWN TIMES | $9,086 | $867 | Implemented |
MI0014 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,618 | $5,000 | Not Implemented |
MI0014 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $661 | $5 | Implemented |
MI0014 # 06 Y:2001 | 06 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,056 | $20 | Implemented |
MI0014 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,454 | $80 | Implemented |
MI0013 # 01 Y:2001 | 01 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,255 | $710 | Not Implemented |
MI0013 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $114,000 | $32,515 | Not Implemented |
MI0013 # 03 Y:2001 | 03 | 2001 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $3,000 | $5,000 | Not Implemented |
MI0013 # 04 Y:2001 | 04 | 2001 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $6,641 | $1,050 | Not Implemented |
MI0013 # 05 Y:2001 | 05 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,176 | $4,500 | Not Implemented |
MI0013 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $9,000 | $680 | Not Implemented |
MI0013 # 07 Y:2001 | 07 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,791 | $15 | Not Implemented |