IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0109 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,351 $5,040 Not Implemented
AR0109 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $90 Implemented
AR0109 # 07 Y:1997 07 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,783 $0 Implemented
AR0109 # 08 Y:1997 08 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,014 $15,000 Not Implemented
AR0109 # 09 Y:1997 09 1997 $69,563 $260,000 Not Implemented
OK0516 # 01 Y:1997 01 1997 INSTALL SET-BACK TIMERS $2,215 $3,472 Implemented
OK0516 # 02 Y:1997 02 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,088 $0 Not Implemented
OK0516 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $415 $1,056 Not Implemented
OK0516 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $304 $542 Implemented
OK0516 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $395 Implemented
ME0206 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,295 $52,234 n/a
ME0206 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,622 $2,500 n/a
ME0206 # 03 Y:1997 03 1997 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $378 $100 n/a
ME0206 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $367 $150 n/a
ME0206 # 05 Y:1997 05 1997 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $306 $71 n/a
ME0206 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $200 n/a
UD0510 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $2,926 $5,000 Not Implemented
UD0510 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,651 $500 Implemented
UD0510 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,314 $1,000 Implemented
UD0510 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,641 $0 Not Implemented
UD0510 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,774 $33,595 Not Implemented
UD0510 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $356 $910 Not Implemented
KG0081 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $1,347 $260 n/a
KG0081 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,028 $317 n/a
KG0081 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $260 n/a