Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0104 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $395 | $600 | Implemented |
BD0104 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $305 | $100 | Implemented |
BD0104 # 04 Y:1998 | 04 | 1998 | USE SYNTHETIC LUBRICANT | $191 | $150 | Implemented |
BD0104 # 05 Y:1998 | 05 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $4,287 | $1,525 | Implemented |
BD0104 # 06 Y:1998 | 06 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $3,425 | $400 | Implemented |
BD0104 # 07 Y:1998 | 07 | 1998 | MINIMIZE WATER USAGE | $823 | $1,125 | Implemented |
BD0104 # 08 Y:1998 | 08 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,375 | $4,395 | Implemented |
NC0132 # 01 Y:1998 | 01 | 1998 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,465 | $14,500 | Not Implemented |
NC0132 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,949 | $11,150 | Not Implemented |
NC0132 # 03 Y:1998 | 03 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,486 | $2,688 | Not Implemented |
NC0132 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $2,506 | $2,940 | Not Implemented |
NC0132 # 05 Y:1998 | 05 | 1998 | INSTALL OCCUPANCY SENSORS | $1,455 | $1,600 | Not Implemented |
NC0132 # 06 Y:1998 | 06 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $440 | $1,333 | Not Implemented |
NC0132 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,816 | $13,801 | Not Implemented |
NC0132 # 08 Y:1998 | 08 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $900 | $200 | Not Implemented |
NC0132 # 09 Y:1998 | 09 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $119,000 | $500 | Not Implemented |
TN0623 # 01 Y:1998 | 01 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $140,000 | $56,120 | Not Implemented |
TN0623 # 02 Y:1998 | 02 | 1998 | AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK | $81,250 | $2,400 | Not Implemented |
TN0623 # 03 Y:1998 | 03 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $77,680 | $121,440 | Implemented |
TN0623 # 04 Y:1998 | 04 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $52,045 | $61,760 | Implemented |
TN0623 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $30,000 | $16,200 | Implemented |
TN0623 # 06 Y:1998 | 06 | 1998 | DISCONNECT BALLASTS | $13,255 | $900 | Not Implemented |
TN0623 # 07 Y:1998 | 07 | 1998 | OPTIMIZE PLANT POWER FACTOR | $9,920 | $16,200 | Not Implemented |
TN0623 # 08 Y:1998 | 08 | 1998 | INSULATE BARE EQUIPMENT | $1,980 | $380 | Not Implemented |
TN0623 # 09 Y:1998 | 09 | 1998 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,230 | $0 | Not Implemented |