IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0104 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $395 $600 Implemented
BD0104 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $100 Implemented
BD0104 # 04 Y:1998 04 1998 USE SYNTHETIC LUBRICANT $191 $150 Implemented
BD0104 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,287 $1,525 Implemented
BD0104 # 06 Y:1998 06 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,425 $400 Implemented
BD0104 # 07 Y:1998 07 1998 MINIMIZE WATER USAGE $823 $1,125 Implemented
BD0104 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,375 $4,395 Implemented
NC0132 # 01 Y:1998 01 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,465 $14,500 Not Implemented
NC0132 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,949 $11,150 Not Implemented
NC0132 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,486 $2,688 Not Implemented
NC0132 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $2,506 $2,940 Not Implemented
NC0132 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $1,455 $1,600 Not Implemented
NC0132 # 06 Y:1998 06 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $440 $1,333 Not Implemented
NC0132 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,816 $13,801 Not Implemented
NC0132 # 08 Y:1998 08 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $900 $200 Not Implemented
NC0132 # 09 Y:1998 09 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $119,000 $500 Not Implemented
TN0623 # 01 Y:1998 01 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $140,000 $56,120 Not Implemented
TN0623 # 02 Y:1998 02 1998 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $81,250 $2,400 Not Implemented
TN0623 # 03 Y:1998 03 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $77,680 $121,440 Implemented
TN0623 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $52,045 $61,760 Implemented
TN0623 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $30,000 $16,200 Implemented
TN0623 # 06 Y:1998 06 1998 DISCONNECT BALLASTS $13,255 $900 Not Implemented
TN0623 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $9,920 $16,200 Not Implemented
TN0623 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $1,980 $380 Not Implemented
TN0623 # 09 Y:1998 09 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,230 $0 Not Implemented