IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122,146

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0661 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,390 $1,000 Implemented
CO0661 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $340 Implemented
CO0661 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,020 $2,860 Not Implemented
CO0661 # 04 Y:2012 04 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $52,770 $500 Not Implemented
CO0661 # 05 Y:2012 05 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,410 $500 Implemented
CO0661 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $4,670 Not Implemented
MAS028 # 01 Y:2012 01 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $37,819 $31,800 Implemented
MAS028 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $22,269 $9,650 Not Implemented
MAS028 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,815 $4,000 Implemented
MAS028 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,781 $0 Not Implemented
MAS028 # 05 Y:2012 05 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,762 $5,000 Implemented
IA0486 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $904 $2,721 Not Implemented
IA0486 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $415 $350 Implemented
IA0486 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $362 $420 Implemented
IA0486 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $448 Implemented
IA0486 # 05 Y:2012 05 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,985 $8,186 Implemented
MZ0094 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,057 $1,160 Implemented
MZ0094 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,672 $3,000 Not Implemented
MZ0094 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,711 $27,900 Implemented
MZ0094 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $621 $0 Implemented
MZ0094 # 05 Y:2012 05 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,785 $30,700 Implemented
MZ0094 # 06 Y:2012 06 2012 USE RADIANT HEATER FOR SPOT HEATING $12,505 $14,400 Not Implemented
MZ0094 # 07 Y:2012 07 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,836 $900 Implemented
UD0862 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,703 $0 Not Implemented
UD0862 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,513 $67,068 Not Implemented