IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0143 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $100 Implemented
UU0143 # 02 Y:2019 02 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,516 $3,140 Implemented
UU0143 # 03 Y:2019 03 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $510 $50 Not Implemented
UU0143 # 04 Y:2019 04 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,501 $3,184 Not Implemented
UU0143 # 05 Y:2019 05 2019 MINIMIZE WATER USAGE $11,728 $50,000 Not Implemented
UU0143 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $220 $275 Implemented
WV0572 # 01 Y:2019 01 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,987 $1,000 Implemented
WV0572 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,442 $38,062 Not Implemented
WV0572 # 03 Y:2019 03 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $6,835 $6,336 Not Implemented
WV0572 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,205 $2,889 Implemented
WV0572 # 05 Y:2019 05 2019 DEVELOP A REPAIR/REPLACE POLICY $2,814 $587 Implemented
WV0572 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,232 $5,400 Not Implemented
AS0469 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,924 $37,163 Not Implemented
AS0469 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,730 $10,305 Not Implemented
AS0469 # 03 Y:2019 03 2019 INSTALL SKYLIGHTS $4,029 $14,835 Not Implemented
AS0469 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,578 $900 Not Implemented
AS0469 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,906 $420 Not Implemented
BS0119 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $36 $30 Not Implemented
BS0119 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $165 Not Implemented
BS0119 # 03 Y:2019 03 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,022 $30 Not Implemented
BS0119 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $20 Not Implemented
CL1903 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,099 $450 Not Implemented
CL1903 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,869 $246,400 Not Implemented
CL1903 # 03 Y:2019 03 2019 USE POWER DURING OFF-PEAK PERIODS $14,816 $1,000 Not Implemented
OK1003 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,820 $1,545 Implemented