IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0047 # 06 Y:1996 06 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,602 $11,180 Implemented
DS0047 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,493 $1,975 Implemented
OK0485 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,114 $23,322 Not Implemented
OK0485 # 02 Y:1996 02 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,827 $2,730 Implemented
OK0485 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $428 $786 Implemented
OK0485 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $395 Not Implemented
OK0485 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,970 $29,500 Implemented
WI0260 # 01 Y:1996 01 1996 INSTALL SET-BACK TIMERS $15,994 $1,600 Not Implemented
WI0260 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,781 $2,212 Implemented
WI0260 # 03 Y:1996 03 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,600 $1,000 Not Implemented
WI0260 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,542 $1,400 Implemented
WI0260 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $820 $1,280 Not Implemented
WI0260 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $755 $210 Implemented
WI0260 # 07 Y:1996 07 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $718 $0 Not Implemented
UD0483 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,684 $3,000 Not Implemented
UD0483 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $337 $150 Not Implemented
UD0483 # 03 Y:1996 03 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,498 $-6,800 Not Implemented
UD0483 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,894 $5,615 Not Implemented
UD0483 # 05 Y:1996 05 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,668 $1,000 Not Implemented
OK0484 # 01 Y:1996 01 1996 INSTALL SET-BACK TIMERS $12,501 $1,360 Implemented
OK0484 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $249 $550 Implemented
OK0484 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $52 $0 Implemented
OK0484 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $395 Not Implemented
OK0484 # 05 Y:1996 05 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $7,114 $7,475 Not Implemented
WI0259 # 01 Y:1996 01 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $24,500 $25,000 Not Implemented