IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1039 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,423 $5,000 Not Implemented
UD1039 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $316 Not Implemented
UD1039 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,654 $50 Not Implemented
UD1039 # 07 Y:2022 07 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,304 $2,369 Not Implemented
UD1038 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,646 $1,000 Implemented
UD1038 # 02 Y:2022 02 2022 REDUCE VENTILATION AIR $34,366 $30,000 Not Implemented
UD1038 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,702 $1,750 Not Implemented
UD1038 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,730 $0 Not Implemented
UD1038 # 05 Y:2022 05 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $26,728 $32,000 Not Implemented
UD1038 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,751 $0 Not Implemented
UD1038 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,037 $29,375 Implemented
UD1037 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,459 $0 Not Implemented
UD1037 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,378 $0 Not Implemented
UD1037 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,323 $0 Implemented
UD1037 # 04 Y:2022 04 2022 INSTALL AUTOMATIC STACK DAMPER $4,890 $2,000 Not Implemented
UD1037 # 05 Y:2022 05 2022 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $26,903 $30,000 Not Implemented
UD1037 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $657 $1,500 Not Implemented
UD1037 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,245 $0 Not Implemented
UD1037 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,275 $14,400 Implemented
UD1037 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,006 $6,975 Implemented
CW0122 # 01 Y:2022 01 2022 TREAT AND REUSE RINSE WATERS $11,974 $2,500 n/a
CW0122 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $3,767 $400 n/a
CW0122 # 03 Y:2022 03 2022 CONVERT TO ROBOTIC PAINTING $102,960 $48,500 n/a
CW0122 # 04 Y:2022 04 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $25,171 $73,990 n/a
CW0122 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $13,037 $60,000 n/a