Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0277 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,442 | $150 | Implemented |
TN0277 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,251 | $500 | Implemented |
TN0277 # 04 Y:1986 | 04 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $2,016 | $125 | Implemented |
TN0277 # 05 Y:1986 | 05 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $581 | $2,500 | Not Implemented |
TN0277 # 06 Y:1986 | 06 | 1986 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $264 | $111 | Not Implemented |
TN0277 # 07 Y:1986 | 07 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $826 | $1,700 | Implemented |
TN0277 # 08 Y:1986 | 08 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $0 | Implemented |
TN0277 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $661 | $440 | Implemented |
TN0277 # 10 Y:1986 | 10 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $149 | $220 | Implemented |
GT0299 # 07 Y:1986 | 07 | 1986 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,163 | $3,000 | Implemented |
KU0206 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,289 | $5,696 | Implemented |
KU0206 # 02 Y:1986 | 02 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,313 | $107 | Implemented |
KU0206 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,935 | $1,500 | Implemented |
KU0206 # 04 Y:1986 | 04 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,243 | $0 | Not Implemented |
KU0206 # 05 Y:1986 | 05 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,155 | $4,000 | Not Implemented |
KU0206 # 06 Y:1986 | 06 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,718 | $1,515 | Not Implemented |
KU0206 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $641 | $0 | Not Implemented |
KU0206 # 08 Y:1986 | 08 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $474 | $0 | Implemented |
KU0206 # 09 Y:1986 | 09 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $979 | $0 | Not Implemented |
KU0206 # 10 Y:1986 | 10 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Implemented |
KU0206 # 11 Y:1986 | 11 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $183 | $100 | Implemented |
KU0206 # 12 Y:1986 | 12 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $115 | $0 | Implemented |
KU0207 # 01 Y:1986 | 01 | 1986 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $164,472 | $840,000 | Not Implemented |
KU0207 # 02 Y:1986 | 02 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,525 | $0 | Implemented |
KU0207 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,480 | $0 | Implemented |