IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0277 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,442 $150 Implemented
TN0277 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $2,251 $500 Implemented
TN0277 # 04 Y:1986 04 1986 REPAIR AND ELIMINATE STEAM LEAKS $2,016 $125 Implemented
TN0277 # 05 Y:1986 05 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $581 $2,500 Not Implemented
TN0277 # 06 Y:1986 06 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $264 $111 Not Implemented
TN0277 # 07 Y:1986 07 1986 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $826 $1,700 Implemented
TN0277 # 08 Y:1986 08 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $396 $0 Implemented
TN0277 # 09 Y:1986 09 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $440 Implemented
TN0277 # 10 Y:1986 10 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $149 $220 Implemented
GT0299 # 07 Y:1986 07 1986 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,163 $3,000 Implemented
KU0206 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,289 $5,696 Implemented
KU0206 # 02 Y:1986 02 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,313 $107 Implemented
KU0206 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,935 $1,500 Implemented
KU0206 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,243 $0 Not Implemented
KU0206 # 05 Y:1986 05 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,155 $4,000 Not Implemented
KU0206 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $1,718 $1,515 Not Implemented
KU0206 # 07 Y:1986 07 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $641 $0 Not Implemented
KU0206 # 08 Y:1986 08 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $474 $0 Implemented
KU0206 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $979 $0 Not Implemented
KU0206 # 10 Y:1986 10 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $239 $0 Implemented
KU0206 # 11 Y:1986 11 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $183 $100 Implemented
KU0206 # 12 Y:1986 12 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $115 $0 Implemented
KU0207 # 01 Y:1986 01 1986 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $164,472 $840,000 Not Implemented
KU0207 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,525 $0 Implemented
KU0207 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,480 $0 Implemented