IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0384 # 07 Y:1989 07 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,870 $2,800 Not Implemented
GT0385 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,400 $7,500 Implemented
GT0385 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $1,050 Not Implemented
GT0385 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $272 $492 Implemented
GT0385 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,000 $1,000 Implemented
GT0385 # 05 Y:1989 05 1989 MODIFY TEXTILE DRYERS $13,700 $0 Implemented
KU0293 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $118 Implemented
KU0293 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $528 $130 Implemented
KU0293 # 03 Y:1989 03 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $360 $41 Implemented
KU0293 # 04 Y:1989 04 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $345 $0 Not Implemented
KU0293 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $1,638 $450 Implemented
KU0293 # 06 Y:1989 06 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $40,497 $0 Not Implemented
KU0294 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $472 Implemented
KU0294 # 02 Y:1989 02 1989 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,418 $15,000 Not Implemented
KU0294 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,667 $8,200 Not Implemented
KU0294 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,153 $4,100 Implemented
KU0294 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $1,104 $600 Implemented
KU0294 # 06 Y:1989 06 1989 RECOVER WASTE HEAT FROM EQUIPMENT $526 $200 Implemented
KU0294 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $579 $0 Implemented
WI0065 # 01 Y:1989 01 1989 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $51,883 $300,000 Not Implemented
WI0065 # 02 Y:1989 02 1989 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,109 $6,000 Not Implemented
WI0065 # 03 Y:1989 03 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,165 $15,000 Not Implemented
WI0065 # 04 Y:1989 04 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,568 $8,000 Not Implemented
WI0065 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $5,346 $750 Implemented
WI0065 # 06 Y:1989 06 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,916 $0 Implemented