IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0384 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,935 $3,250 Not Implemented
WI0384 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $5,952 $1,000 Not Implemented
WI0384 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,745 $640 Not Implemented
WI0384 # 07 Y:2000 07 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,623 $1,033 Not Implemented
WI0384 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,185 $427 Not Implemented
WI0384 # 09 Y:2000 09 2000 USE OPTIMUM THICKNESS INSULATION $370 $375 Not Implemented
CO0475 # 01 Y:2000 01 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $4,580 Not Implemented
CO0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $3,330 $5,470 Not Implemented
CO0475 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,100 $6,000 Not Implemented
CO0475 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $300 $490 Implemented
CO0475 # 05 Y:2000 05 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,430 $0 Implemented
CO0475 # 06 Y:2000 06 2000 $34,630 $100,000 Implemented
CO0475 # 07 Y:2000 07 2000 $14,590 $45,000 Not Implemented
CO0475 # 08 Y:2000 08 2000 $6,520 $20,000 Not Implemented
GT0701 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,490 $5,000 Not Implemented
GT0701 # 02 Y:2000 02 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $23,600 $2,200 Not Implemented
GT0701 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,842 $9,456 Not Implemented
GT0701 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,420 $25,117 Implemented
GT0701 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $2,219 $0 Implemented
GT0701 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,845 $0 Implemented
GT0701 # 07 Y:2000 07 2000 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $36,500 $28,000 Not Implemented
GT0701 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,234 $2,999 Not Implemented
KU0551 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,821 $18,000 Not Implemented
KU0551 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,010 $60 Not Implemented
KU0551 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,370 $890 Not Implemented