IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0264 # 08 Y:2007 08 2007 USE SYNTHETIC LUBRICANT $3,151 $500 Not Implemented
LE0264 # 09 Y:2007 09 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,674 $5,000 Not Implemented
LE0264 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,000 Implemented
LE0264 # 11 Y:2007 11 2007 INSTALL OCCUPANCY SENSORS $3,069 $750 Not Implemented
LE0263 # 01 Y:2007 01 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $88,058 $368,500 Not Implemented
LE0263 # 02 Y:2007 02 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $59,097 $300 Not Implemented
LE0263 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $103,515 $150,000 Not Implemented
LE0263 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,993 $70,000 Not Implemented
LE0263 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $20,000 Not Implemented
LE0263 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,639 $1,000 Not Implemented
LE0263 # 07 Y:2007 07 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,256 $50,000 Not Implemented
LE0263 # 08 Y:2007 08 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $9,899 $22,894 Not Implemented
LE0263 # 09 Y:2007 09 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,837 $6,837 Not Implemented
LE0263 # 10 Y:2007 10 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,781 $6,000 Not Implemented
LE0263 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,214 $1,000 Not Implemented
LE0263 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $2,460 $1,200 Not Implemented
SD0398 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,030 $45,224 Implemented
SD0398 # 02 Y:2007 02 2007 INSTALL SKYLIGHTS $4,253 $13,615 Not Implemented
SD0398 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $2,091 $150 Implemented
SD0398 # 04 Y:2007 04 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,860 $5,101 Not Implemented
SD0398 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,353 $2,193 Not Implemented
LL0286 # 01 Y:2007 01 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,249 $750 Not Implemented
LL0286 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,092 $696 Implemented
LL0286 # 03 Y:2007 03 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,261 $304 Not Implemented
LL0286 # 04 Y:2007 04 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,927 $90 Implemented