Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0341 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,466 | $38,639 | Not Implemented |
MI0341 # 08 Y:2018 | 08 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,872 | $3,380 | Not Implemented |
MI0341 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $24,956 | $7,314 | Not Implemented |
MI0341 # 10 Y:2018 | 10 | 2018 | OPTIMIZE PLANT POWER FACTOR | $17,936 | $25,045 | Not Implemented |
MI0341 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $3,246 | $2,109 | Not Implemented |
MI0341 # 12 Y:2018 | 12 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $803 | $1,560 | Not Implemented |
WM0126 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $95,648 | $66,000 | Not Implemented |
WM0126 # 02 Y:2018 | 02 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $26,985 | $20,000 | Not Implemented |
WM0126 # 03 Y:2018 | 03 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,198 | $48,500 | Not Implemented |
WM0126 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,475 | $8,650 | Not Implemented |
WM0126 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $15,236 | Implemented |
WM0126 # 06 Y:2018 | 06 | 2018 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $6,480 | Implemented |
WM0126 # 07 Y:2018 | 07 | 2018 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,029 | $1,710 | Not Implemented |
WM0126 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,101 | $2,850 | Not Implemented |
WM0126 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,864 | $0 | Not Implemented |
WV0566 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,581 | $575 | Implemented |
WV0566 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,590 | $114,000 | Not Implemented |
WV0566 # 02 Y:2018 | 02 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $4,621 | $945 | Implemented |
WV0566 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,255 | $600 | Implemented |
WV0566 # 04 Y:2018 | 04 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,029 | $500 | Implemented |
WV0566 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,643 | $5,200 | Not Implemented |
WV0566 # 07 Y:2018 | 07 | 2018 | MINIMIZE WATER USAGE | $1,217 | $3,150 | Implemented |
WV0566 # 08 Y:2018 | 08 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,023 | $500 | Not Implemented |
WV0566 # 09 Y:2018 | 09 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $595 | $50 | Implemented |
WV0566 # 10 Y:2018 | 10 | 2018 | INSULATE BARE EQUIPMENT | $114 | $180 | Implemented |