IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0316 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,528 $625 Not Implemented
MZ0316 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,220 $3,485 Implemented
UU0191 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,749 $38,000 Implemented
UU0191 # 02 Y:2021 02 2021 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,428 $14,400 Implemented
UU0191 # 03 Y:2021 03 2021 USE SOLAR HEAT FOR HEAT $4,877 $10,800 Not Implemented
UU0191 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,303 $150 Implemented
UU0191 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $4,613 Implemented
UU0191 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,172 $2,482 Not Implemented
UU0191 # 07 Y:2021 07 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $154 $71 Not Implemented
UU0191 # 08 Y:2021 08 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $114 $50 Implemented
WV0612 # 01 Y:2021 01 2021 CONVERT TO OXYFUEL BURNERS $30,507 $81,760 Not Implemented
WV0612 # 02 Y:2021 02 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $22,389 $99,385 Not Implemented
WV0612 # 03 Y:2021 03 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,446 $16,700 Implemented
WV0612 # 04 Y:2021 04 2021 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $13,924 $27,550 Not Implemented
WV0612 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,798 $7,637 Not Implemented
WV0612 # 06 Y:2021 06 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,641 $4,320 Implemented
WV0612 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,008 $8,132 Implemented
WV0612 # 08 Y:2021 08 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,683 $8,044 Not Implemented
WV0612 # 09 Y:2021 09 2021 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,090 $1,341 Not Implemented
WV0612 # 10 Y:2021 10 2021 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $701 $397 Implemented
WV0612 # 11 Y:2021 11 2021 INSTALL SET-BACK TIMERS $611 $1,110 Implemented
NC0667 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,346 $3,990 n/a
NC0667 # 02 Y:2021 02 2021 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $11,532 $30,000 n/a
NC0667 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $4,354 $2,000 n/a
NC0667 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $10,960 $1,960 n/a