Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0378 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,660 | $500 | Implemented |
AM0378 # 04 Y:2000 | 04 | 2000 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $13,630 | $699 | Implemented |
AM0378 # 05 Y:2000 | 05 | 2000 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $11,000 | $1,350 | Implemented |
AM0378 # 06 Y:2000 | 06 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,638 | $0 | Not Implemented |
AM0378 # 07 Y:2000 | 07 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $4,000 | $0 | Implemented |
AM0378 # 08 Y:2000 | 08 | 2000 | SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM | $3,610 | $0 | Implemented |
AM0378 # 09 Y:2000 | 09 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,450 | $0 | Implemented |
AM0378 # 10 Y:2000 | 10 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,390 | $0 | Not Implemented |
AM0378 # 11 Y:2000 | 11 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,310 | $2,800 | Implemented |
AM0378 # 12 Y:2000 | 12 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $250 | Not Implemented |
OK0601 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $684 | $3,500 | Implemented |
OK0601 # 02 Y:2000 | 02 | 2000 | INSTALL COMMON HEADER ON COMPRESSORS | $11,372 | $3,000 | Not Implemented |
OK0601 # 03 Y:2000 | 03 | 2000 | USE PHOTOCELL CONTROLS | $17,881 | $5,000 | Implemented |
OK0601 # 04 Y:2000 | 04 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $140,000 | $100,000 | Not Implemented |
OK0601 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,952 | $0 | Not Implemented |
OK0601 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $14,040 | $35,000 | Implemented |
OK0601 # 07 Y:2000 | 07 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $5,829 | $0 | Not Implemented |
AM0377 # 01 Y:2000 | 01 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $27,190 | $0 | Implemented |
AM0377 # 02 Y:2000 | 02 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $11,500 | $6,100 | Implemented |
AM0377 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,870 | $500 | Implemented |
AM0377 # 04 Y:2000 | 04 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $900 | $1,000 | Not Implemented |
AM0377 # 05 Y:2000 | 05 | 2000 | INSTALL OCCUPANCY SENSORS | $450 | $110 | Implemented |
AM0377 # 06 Y:2000 | 06 | 2000 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $320 | $0 | Implemented |
AM0377 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $230 | $0 | Implemented |
AM0376 # 01 Y:2000 | 01 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $77,809 | $157,500 | Not Implemented |