IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0492 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $220 $612 Not Implemented
AS0491 # 01 Y:2020 01 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $176,974 $3,941 Implemented
AS0491 # 02 Y:2020 02 2020 COMBINE UTILITY METERS $69,299 $735 Not Implemented
AS0491 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,587 $9,520 Not Implemented
AS0491 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $1,757 $511 Implemented
AS0491 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,511 $2,230 Implemented
AS0491 # 06 Y:2020 06 2020 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $235 $38 Implemented
AS0490 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,708 $1,550 Not Implemented
AS0490 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $3,534 $3,368 Implemented
AS0490 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,729 $410 Implemented
AS0490 # 04 Y:2020 04 2020 KEEP EQUIPMENT CLEAN $991 $464 Implemented
AS0490 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $891 $397 Implemented
AS0489 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,774 $11,876 Not Implemented
AS0489 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,308 $21,823 Not Implemented
AS0489 # 03 Y:2020 03 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,899 $28,466 Not Implemented
AS0489 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $6,004 $7,027 Not Implemented
AS0489 # 05 Y:2020 05 2020 REDUCE HEAT GAIN BY WINDOW TINTING $5,105 $19,291 Not Implemented
AS0489 # 06 Y:2020 06 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,216 $30 Not Implemented
AS0489 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $805 $135 Not Implemented
AS0489 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $675 $122 Implemented
AS0489 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $106 $394 Not Implemented
AS0488 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $118,609 $10,790 Implemented
AS0488 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,944 $27,312 Not Implemented
AS0488 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,602 $272 Implemented
AS0488 # 04 Y:2020 04 2020 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,344 $36 Implemented