Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,224
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0829 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,481 | $500 | Implemented |
GT0829 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $45,543 | $32,500 | Not Implemented |
GT0829 # 03 Y:2006 | 03 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,510 | $11,358 | Not Implemented |
GT0829 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,460 | $13,714 | Not Implemented |
NC0345 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,498 | $4,000 | Not Implemented |
NC0345 # 02 Y:2006 | 02 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,488 | $8,000 | Not Implemented |
NC0345 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,461 | $4,000 | Not Implemented |
NC0345 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,300 | $50 | Not Implemented |
NC0345 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,538 | $2,465 | Not Implemented |
NC0345 # 06 Y:2006 | 06 | 2006 | USE PHOTOCELL CONTROLS | $147 | $95 | Not Implemented |
NC0345 # 07 Y:2006 | 07 | 2006 | USE PHOTOCELL CONTROLS | $291 | $95 | Implemented |
NC0338 # 01 Y:2006 | 01 | 2006 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $63,286 | $175,000 | Implemented |
NC0338 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $54,759 | $18,800 | Not Implemented |
NC0338 # 03 Y:2006 | 03 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,391 | $2,500 | Implemented |
NC0338 # 04 Y:2006 | 04 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $20,374 | $75,000 | Implemented |
NC0338 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,416 | $16,843 | Implemented |
NC0338 # 06 Y:2006 | 06 | 2006 | COVER OPEN TANKS | $1,097 | $1,600 | Implemented |
GT0810 # 01 Y:2005 | 01 | 2005 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $30,000 | $0 | Not Implemented |
GT0810 # 02 Y:2005 | 02 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $20,000 | $0 | Not Implemented |
GT0810 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,359 | $9,400 | Not Implemented |
GT0810 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,228 | $6,378 | Implemented |
GT0810 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,562 | $7,239 | Not Implemented |
GT0810 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $7,399 | $7,301 | Not Implemented |
GT0810 # 07 Y:2005 | 07 | 2005 | INSTALL SPECTRAL REFLECTORS / DELAMP | $7,167 | $14,160 | Not Implemented |
GT0810 # 08 Y:2005 | 08 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $25,152 | $62,500 | Not Implemented |