IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0162 # 03 Y:1992 03 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $524 $750 Implemented
OR0162 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,666 $5,359 Implemented
OR0162 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,388 $14,272 Not Implemented
OR0162 # 06 Y:1992 06 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $26,207 $150,000 Implemented
OR0162 # 07 Y:1992 07 1992 REDESIGN PROCESS $15,590 $130,000 Not Implemented
CO0254 # 01 Y:1992 01 1992 USE MORE EFFICIENT ADHESIVE APPLICATORS $10,925 $2,200 Not Implemented
CO0254 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,850 $160 Implemented
CO0254 # 03 Y:1992 03 1992 UPGRADE CONTROLS ON COMPRESSORS $310 $50 Implemented
CO0254 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $690 $160 Implemented
CO0254 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $1,320 Implemented
CO0254 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,020 $1,190 Implemented
CO0254 # 07 Y:1992 07 1992 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,610 $800 Implemented
CO0254 # 08 Y:1992 08 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,940 $14,000 Implemented
CO0254 # 09 Y:1992 09 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $560 $1,100 Implemented
CO0254 # 10 Y:1992 10 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,170 $10,320 Implemented
HO0028 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,202 $2,483 Not Implemented
HO0028 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $562 Not Implemented
HO0028 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $387 $140 Not Implemented
HO0028 # 04 Y:1992 04 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $79 $132 Not Implemented
HO0028 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $974 $1,000 Not Implemented
CO0253 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,800 $20 Not Implemented
CO0253 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $100 Not Implemented
CO0253 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,410 $100 Not Implemented
CO0253 # 04 Y:1992 04 1992 REDUCE VENTILATION AIR $4,140 $1,200 Not Implemented
CO0253 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,350 $800 Not Implemented