Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0071 # 04 Y:1996 | 04 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,217 | $9,600 | Not Implemented |
UM0071 # 05 Y:1996 | 05 | 1996 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $352 | $0 | Not Implemented |
OR0285 # 01 Y:1996 | 01 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $33,432 | $0 | Implemented |
OR0285 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $464 | $142 | Implemented |
OR0285 # 03 Y:1996 | 03 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $36,382 | $10,450 | Implemented |
OR0285 # 04 Y:1996 | 04 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,815 | $0 | Not Implemented |
OR0285 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,671 | $15,663 | Implemented |
OR0285 # 06 Y:1996 | 06 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $686 | $2,582 | Not Implemented |
SF0104 # 01 Y:1996 | 01 | 1996 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,415 | $8,500 | Not Implemented |
SF0104 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,960 | $20,930 | Implemented |
SF0104 # 03 Y:1996 | 03 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,794 | $9,792 | Implemented |
SF0104 # 04 Y:1996 | 04 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,011 | $4,970 | Implemented |
SF0104 # 05 Y:1996 | 05 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,069 | $1,792 | Implemented |
SF0104 # 06 Y:1996 | 06 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,248 | $2,120 | Implemented |
SF0104 # 07 Y:1996 | 07 | 1996 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $663 | $1,089 | Implemented |
SF0104 # 08 Y:1996 | 08 | 1996 | REPAIR AND ELIMINATE STEAM LEAKS | $558 | $375 | Implemented |
SF0104 # 09 Y:1996 | 09 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,017 | $120 | Implemented |
SF0104 # 10 Y:1996 | 10 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $932 | $500 | Not Implemented |
SF0104 # 11 Y:1996 | 11 | 1996 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $171,634 | $672,500 | Not Implemented |
SF0104 # 12 Y:1996 | 12 | 1996 | USE EVAPORATION TO CONCENTRATE MATERIAL | $65,621 | $78,072 | Not Implemented |
SF0104 # 13 Y:1996 | 13 | 1996 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $12,812 | $250 | Implemented |
SF0104 # 14 Y:1996 | 14 | 1996 | TREAT AND REUSE RINSE WATERS | $14,517 | $3,115 | Implemented |
UD0505 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $12,351 | $9,000 | Implemented |
UD0505 # 02 Y:1996 | 02 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,214 | $0 | Implemented |
UD0505 # 03 Y:1996 | 03 | 1996 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $8,648 | $4,000 | Implemented |