IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,815 $0 Not Implemented
OR0285 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,671 $15,663 Implemented
OR0285 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $686 $2,582 Not Implemented
UM0071 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $209 $422 Not Implemented
UM0071 # 02 Y:1996 02 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,820 $250 Not Implemented
UM0071 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $759 $1,000 Not Implemented
UM0071 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,217 $9,600 Not Implemented
UM0071 # 05 Y:1996 05 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $352 $0 Not Implemented
SF0104 # 01 Y:1996 01 1996 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,415 $8,500 Not Implemented
SF0104 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,960 $20,930 Implemented
SF0104 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,794 $9,792 Implemented
SF0104 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,011 $4,970 Implemented
SF0104 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,069 $1,792 Implemented
SF0104 # 06 Y:1996 06 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $1,248 $2,120 Implemented
SF0104 # 07 Y:1996 07 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $663 $1,089 Implemented
SF0104 # 08 Y:1996 08 1996 REPAIR AND ELIMINATE STEAM LEAKS $558 $375 Implemented
SF0104 # 09 Y:1996 09 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $120 Implemented
SF0104 # 10 Y:1996 10 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $932 $500 Not Implemented
SF0104 # 11 Y:1996 11 1996 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $171,634 $672,500 Not Implemented
SF0104 # 12 Y:1996 12 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $65,621 $78,072 Not Implemented
SF0104 # 13 Y:1996 13 1996 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $12,812 $250 Implemented
SF0104 # 14 Y:1996 14 1996 TREAT AND REUSE RINSE WATERS $14,517 $3,115 Implemented
UD0505 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $12,351 $9,000 Implemented
UD0505 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,214 $0 Implemented
UD0505 # 03 Y:1996 03 1996 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $8,648 $4,000 Implemented