IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0420 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,722 $5,940 Not Implemented
MA0420 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,382 $6,000 Not Implemented
MA0420 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $1,724 $195 Implemented
HO0187 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,545 $90,112 Not Implemented
HO0187 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $133 $415 Not Implemented
HO0187 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $267 $500 Implemented
HO0187 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,092 $650 Not Implemented
HO0187 # 05 Y:1998 05 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $807 $250 Implemented
HO0187 # 06 Y:1998 06 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,125 $100 Implemented
IA0211 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,647 $53,193 Not Implemented
IA0211 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $2,579 $1,064 Implemented
IA0211 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,935 $700 Implemented
IA0211 # 04 Y:1998 04 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $20,305 $2,250 Implemented
IA0211 # 05 Y:1998 05 1998 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $8,750 $1,448 Not Implemented
IA0211 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $57,028 $800 Implemented
IA0211 # 07 Y:1998 07 1998 $24,960 $25,440 Implemented
CO0428 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $8,036 Not Implemented
CO0428 # 02 Y:1998 02 1998 DISCONNECT BALLASTS $3,050 $350 Not Implemented
CO0428 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $50 Not Implemented
CO0428 # 04 Y:1998 04 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $500 $1,750 Not Implemented
SF0154 # 01 Y:1998 01 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,242 $0 Implemented
SF0154 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,256 $73,966 Not Implemented
SF0154 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,646 $4,900 Implemented
SF0154 # 04 Y:1998 04 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $15,577 $17,000 Not Implemented
SF0154 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,270 $17,928 Not Implemented