Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0420 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,722 | $5,940 | Not Implemented |
MA0420 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,382 | $6,000 | Not Implemented |
MA0420 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $1,724 | $195 | Implemented |
HO0187 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,545 | $90,112 | Not Implemented |
HO0187 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $133 | $415 | Not Implemented |
HO0187 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $267 | $500 | Implemented |
HO0187 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $1,092 | $650 | Not Implemented |
HO0187 # 05 Y:1998 | 05 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $807 | $250 | Implemented |
HO0187 # 06 Y:1998 | 06 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,125 | $100 | Implemented |
IA0211 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,647 | $53,193 | Not Implemented |
IA0211 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $2,579 | $1,064 | Implemented |
IA0211 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,935 | $700 | Implemented |
IA0211 # 04 Y:1998 | 04 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $20,305 | $2,250 | Implemented |
IA0211 # 05 Y:1998 | 05 | 1998 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $8,750 | $1,448 | Not Implemented |
IA0211 # 06 Y:1998 | 06 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $57,028 | $800 | Implemented |
IA0211 # 07 Y:1998 | 07 | 1998 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $24,960 | $25,440 | Implemented |
CO0428 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,428 | $8,036 | Not Implemented |
CO0428 # 02 Y:1998 | 02 | 1998 | DISCONNECT BALLASTS | $3,050 | $350 | Not Implemented |
CO0428 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $50 | Not Implemented |
CO0428 # 04 Y:1998 | 04 | 1998 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $500 | $1,750 | Not Implemented |
SF0154 # 01 Y:1998 | 01 | 1998 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $3,242 | $0 | Implemented |
SF0154 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $112,256 | $73,966 | Not Implemented |
SF0154 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,646 | $4,900 | Implemented |
SF0154 # 04 Y:1998 | 04 | 1998 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $15,577 | $17,000 | Not Implemented |
SF0154 # 05 Y:1998 | 05 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,270 | $17,928 | Not Implemented |