Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0285 # 09 Y:2001 | 09 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $20,950 | $11,700 | Implemented |
UM0194 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,736 | $5,155 | Not Implemented |
UM0194 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,606 | $900 | Not Implemented |
UM0194 # 03 Y:2001 | 03 | 2001 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $19,450 | $15,600 | Not Implemented |
UM0194 # 04 Y:2001 | 04 | 2001 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $90,700 | $25,200 | Not Implemented |
UM0194 # 05 Y:2001 | 05 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,925 | $132,000 | Not Implemented |
UM0194 # 06 Y:2001 | 06 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,888 | $4,500 | Not Implemented |
UM0194 # 07 Y:2001 | 07 | 2001 | OPTIMIZE PLANT POWER FACTOR | $14,163 | $22,163 | Not Implemented |
LL0125 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $766 | $2,625 | Implemented |
LL0125 # 02 Y:2001 | 02 | 2001 | USE PHOTOCELL CONTROLS | $296 | $71 | Not Implemented |
LL0125 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,327 | $13,815 | Implemented |
LL0125 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $813 | $915 | Not Implemented |
LL0125 # 05 Y:2001 | 05 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $680 | $0 | Implemented |
LL0125 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,602 | $706 | Implemented |
MA0496 # 01 Y:2001 | 01 | 2001 | RECOVER MECHANICAL ENERGY | $9,000 | $40,000 | Implemented |
MA0496 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,447 | $17,000 | Not Implemented |
MA0496 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,736 | $23,650 | Not Implemented |
MA0496 # 04 Y:2001 | 04 | 2001 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,155 | $50,000 | Not Implemented |
MA0496 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,200 | $0 | Implemented |
MA0496 # 06 Y:2001 | 06 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,090 | $1,100 | Implemented |
MA0496 # 07 Y:2001 | 07 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $846 | $3,000 | Implemented |
MA0496 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $73 | $400 | Implemented |
LE0125 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,715 | $2,500 | Not Implemented |
LE0125 # 02 Y:2001 | 02 | 2001 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,926 | $0 | Implemented |
LE0125 # 03 Y:2001 | 03 | 2001 | IMPROVE LUBRICATION PRACTICES | $1,126 | $400 | Not Implemented |