IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0708 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $22,586 $0 Implemented
UD0708 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,091 $0 Not Implemented
UD0708 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,364 $20,952 Implemented
UD0708 # 09 Y:2004 09 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,451 $0 Implemented
UD0708 # 10 Y:2004 10 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,013 $780 Not Implemented
UD0708 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,678 $10,931 Implemented
UD0708 # 12 Y:2004 12 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,677 $5,152 Not Implemented
UD0708 # 13 Y:2004 13 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,344 $0 Not Implemented
UD0708 # 14 Y:2004 14 2004 INSULATE BARE EQUIPMENT $2,927 $986 Not Implemented
WI0480 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,263 $39,140 Not Implemented
WI0480 # 02 Y:2004 02 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $3,606 $500 Implemented
WI0480 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,086 $5,500 Not Implemented
WI0480 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $1,779 $600 Not Implemented
WI0480 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,595 $150 Not Implemented
WI0480 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,496 $640 Not Implemented
WI0480 # 07 Y:2004 07 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $634 $1,500 Implemented
WI0480 # 08 Y:2004 08 2004 REPAIR AND ELIMINATE STEAM LEAKS $554 $0 Implemented
WI0480 # 09 Y:2004 09 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $372 $600 Not Implemented
WI0480 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $364 $160 Implemented
WI0480 # 11 Y:2004 11 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $137 $0 Implemented
TA0077 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,970 $0 Not Implemented
TA0077 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,104 $8,650 Not Implemented
TA0077 # 04 Y:2004 04 2004 RECOVER AND REUSE COOLING WATER $4,087 $1,685 Not Implemented
TA0077 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,474 $840 Not Implemented
TA0077 # 01 Y:2004 01 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $42,000 $0 Not Implemented