IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0315 # 07 Y:2005 07 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $600 $1,082 Not Implemented
SF0315 # 08 Y:2005 08 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19 $24 Not Implemented
SF0315 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $1,186 $2,422 Not Implemented
SF0315 # 10 Y:2005 10 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6 $16,353 Not Implemented
SF0315 # 11 Y:2005 11 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $388 $1,032 Not Implemented
WV0327 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $11,686 $2,140 Implemented
WV0327 # 02 Y:2005 02 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,890 $3,960 Not Implemented
WV0327 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,323 $3,960 Implemented
WV0327 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,759 $1,000 Implemented
WV0327 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $2,644 Not Implemented
WV0327 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,057 $696 Implemented
WV0327 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $476 $632 Not Implemented
WV0327 # 08 Y:2005 08 2005 USE SYNTHETIC LUBRICANT $415 $24 Implemented
WV0327 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $388 $176 Implemented
WV0327 # 10 Y:2005 10 2005 DEVELOP A REPAIR/REPLACE POLICY $342 $60 Implemented
WV0327 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $301 $135 Not Implemented
WV0327 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $246 $0 Implemented
WV0327 # 13 Y:2005 13 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $224 $120 Implemented
WV0327 # 14 Y:2005 14 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,365 $96 Implemented
UU0088 # 01 Y:2005 01 2005 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,720 $68,760 Not Implemented
UU0088 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $703 $6,400 Not Implemented
UU0088 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,915 $900 Not Implemented
UU0088 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,670 $19,930 Not Implemented
UU0088 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,940 $30,000 Not Implemented
UU0088 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $15,260 $13,990 Not Implemented