IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0286 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $920 Implemented
LL0286 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,534 $30 Implemented
LL0286 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $602 $420 Not Implemented
LL0286 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $519 $798 Implemented
BD0332 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $20,588 $1,951 Not Implemented
BD0332 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $608 $1,401 Not Implemented
BD0332 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $476 Not Implemented
BD0332 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $2 Not Implemented
BD0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $496 $351 Not Implemented
BD0332 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $23,837 $40,001 Not Implemented
BD0332 # 07 Y:2007 07 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,182 $2 Not Implemented
OK0752 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,323 $2,319 Not Implemented
OK0752 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,360 $0 Not Implemented
OK0752 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,978 $1,000 Not Implemented
OK0752 # 04 Y:2007 04 2007 USE RADIANT HEATER FOR SPOT HEATING $3,226 $5,328 Not Implemented
OK0752 # 05 Y:2007 05 2007 USE RADIANT HEATER FOR SPOT HEATING $9,113 $12,000 Not Implemented
OK0752 # 06 Y:2007 06 2007 UPGRADE CONTROLS ON COMPRESSORS $239 $70 Not Implemented
OK0752 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,114 $7,711 Not Implemented
OK0752 # 08 Y:2007 08 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,548 $0 Not Implemented
OK0752 # 09 Y:2007 09 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $20,273 $2,500 Not Implemented
OK0752 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $499 $8,116 Not Implemented
UA0010 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,084 $70,481 Implemented
UA0010 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,004 $14,292 Implemented
UA0010 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $742 $0 Not Implemented
UA0010 # 04 Y:2007 04 2007 INSTALL TIMERS AND/OR THERMOSTATS $426 $590 Implemented