IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3023 # 07 Y:2012 07 2012 DISCONNECT BALLASTS $6,783 $1,013 Implemented
UA3023 # 08 Y:2012 08 2012 DISCONNECT BALLASTS $4,820 $810 Implemented
UA3023 # 09 Y:2012 09 2012 DISCONNECT BALLASTS $3,927 $810 Implemented
UA3023 # 10 Y:2012 10 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,216 $430 Not Implemented
OK0835 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,445 $1,500 Implemented
OK0835 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,644 $17,103 Not Implemented
OK0835 # 03 Y:2012 03 2012 REPLACE BOILER $10,532 $96,000 Not Implemented
OK0835 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $538 $3,183 Implemented
OK0835 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $5,126 Not Implemented
OK0835 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $18,902 $19,520 Not Implemented
OK0835 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,139 $33,990 Not Implemented
OK0835 # 08 Y:2012 08 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,097 $24,155 Not Implemented
OK0835 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,068 $1,288 Not Implemented
OK0835 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,937 $1,000 Implemented
OK0835 # 11 Y:2012 11 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $621 $120 Implemented
OK0835 # 12 Y:2012 12 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $31,425 $0 Implemented
OK0835 # 13 Y:2012 13 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,840 $4,000 Not Implemented
OK0835 # 14 Y:2012 14 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $987 $240 Not Implemented
OR0596 # 01 Y:2012 01 2012 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,782 $7,200 Not Implemented
OR0596 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $7,460 Not Implemented
OR0596 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,779 $2,217 Implemented
OR0596 # 04 Y:2012 04 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,274 $46,450 Not Implemented
OR0596 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,326 $6,711 Not Implemented
OR0596 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $80,359 $51,328 Not Implemented
OR0596 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $48,291 $10,000 Implemented