IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0019 # 03 Y:2019 03 2019 INSTALL WIND POWERED ELECTRIC GENERATOR $135,960 $1,346,000 Not Implemented
TR0018 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,196 $14,000 Not Implemented
TR0018 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,055 $1,825 Implemented
TR0018 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,937 $6,050 Implemented
TR0018 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $308 Not Implemented
TR0018 # 05 Y:2019 05 2019 RECOVER MECHANICAL ENERGY $5,431 $25,000 Not Implemented
NC0642 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $214 $1,000 Not Implemented
NC0642 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $505 $480 Not Implemented
NC0642 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,398 $120 Not Implemented
NC0642 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,383 $500 Implemented
NC0642 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $401 $1,798 Not Implemented
SU0488 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $27 $0 Not Implemented
SU0488 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,216 $264 Implemented
SU0488 # 03 Y:2019 03 2019 REDUCE VENTILATION AIR $2,109 $941 Not Implemented
SU0488 # 04 Y:2019 04 2019 ELIMINATE/REDUCE AN OPERATION $6,705 $3,690 Not Implemented
SU0488 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $273 $652 Not Implemented
UD1004 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,429 $0 Not Implemented
UD1004 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,197 $0 Not Implemented
UD1004 # 03 Y:2019 03 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,185 $0 Not Implemented
UD1004 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $0 Not Implemented
UD1004 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,158 $0 Not Implemented
IP0127 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,178 $0 Not Implemented
IP0127 # 02 Y:2019 02 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,715 $30 Not Implemented
IP0127 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,511 $70 Implemented
IP0127 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,687 $2,825 Implemented