IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0233 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,649 $320 Implemented
UF0233 # 04 Y:1999 04 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,433 $3,905 Not Implemented
UF0233 # 05 Y:1999 05 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $10,287 $14,925 Implemented
UF0233 # 06 Y:1999 06 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $33,600 $0 Implemented
UF0233 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $225 $210 Not Implemented
UF0234 # 01 Y:1999 01 1999 INSULATE BARE EQUIPMENT $918 $0 Not Implemented
UF0234 # 02 Y:1999 02 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,396 $0 Not Implemented
UF0234 # 03 Y:1999 03 1999 REUSE SCRAP GLASS AS FEED STOCK $3,072 $0 Not Implemented
UF0234 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $468,000 $0 Not Implemented
UF0234 # 05 Y:1999 05 1999 LEASE EQUIPMENT INSTEAD OF PURCHASING $14,400 $0 Not Implemented
UF0227 # 01 Y:1999 01 1999 USE OPTIMUM THICKNESS INSULATION $7,828 $0 Not Implemented
UF0227 # 02 Y:1999 02 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,822 $0 Implemented
UF0227 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,143 $0 Implemented
UF0227 # 04 Y:1999 04 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $5,616 $0 Implemented
UF0227 # 05 Y:1999 05 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,920 $0 Not Implemented
UF0227 # 06 Y:1999 06 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $4,493 $0 Not Implemented
UF0232 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $192,386 $82,242 Not Implemented
UF0232 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,006 $60 Implemented
UF0232 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,521 $1,500 Implemented
UF0232 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,539 $834 Implemented
UF0232 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,215 $0 Implemented
UF0232 # 06 Y:1999 06 1999 USE PLASTIC PALLETS INSTEAD OF WOOD $25,200 $14,070 Implemented
UF0232 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $262,532 $850,000 Not Implemented
UF0232 # 08 Y:1999 08 1999 $15,848 $75,000 Implemented
UF0231 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,328 $4,141 Not Implemented