Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,990
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0665 # 04 Y:2003 | 04 | 2003 | COVER OPEN TANKS | $7,200 | $12,000 | Not Implemented |
UD0665 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,325 | $0 | Implemented |
UD0665 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,561 | $8,112 | Implemented |
UD0665 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,363 | $6,762 | Not Implemented |
UD0665 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,130 | $1,000 | Not Implemented |
UD0665 # 09 Y:2003 | 09 | 2003 | DISCONNECT BALLASTS | $790 | $45 | Implemented |
UD0665 # 10 Y:2003 | 10 | 2003 | COVER OPEN TANKS | $256 | $400 | Implemented |
WV0259 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,930 | $250 | Implemented |
WV0259 # 08 Y:2003 | 08 | 2003 | INSULATE BARE EQUIPMENT | $12,370 | $1,015 | Not Implemented |
WV0259 # 09 Y:2003 | 09 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,414 | $420 | Not Implemented |
WV0259 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,727 | $250 | Implemented |
WV0259 # 11 Y:2003 | 11 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,126 | $800 | Implemented |
WV0259 # 12 Y:2003 | 12 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $217 | $50 | Implemented |
WV0259 # 01 Y:2003 | 01 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $217 | $450 | Implemented |
WV0259 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM THICKNESS INSULATION | $2,207 | $375 | Not Implemented |
WV0259 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,449 | $10,381 | Implemented |
WV0259 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $144 | $136 | Implemented |
WV0259 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,897 | $50 | Implemented |
WV0259 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $185 | Not Implemented |
UD0664 # 01 Y:2003 | 01 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $115,000 | $1,000 | Not Implemented |
UD0664 # 02 Y:2003 | 02 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $61,800 | $144,000 | Not Implemented |
UD0664 # 03 Y:2003 | 03 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $61,795 | $35,000 | Implemented |
UD0664 # 04 Y:2003 | 04 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $37,413 | $28,500 | n/a |
UD0664 # 05 Y:2003 | 05 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,536 | $2,600 | Not Implemented |
UD0664 # 06 Y:2003 | 06 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,785 | $800 | Implemented |