Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1901 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $483 | $75 | Not Implemented |
LS1901 # 04 Y:2019 | 04 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,150 | $100 | Implemented |
LS1901 # 05 Y:2019 | 05 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $45,500 | $27,000 | Not Implemented |
LS1901 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,246 | $21,652 | Not Implemented |
MZ0261 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71,753 | $36,641 | Implemented |
MZ0261 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $61,928 | $33,392 | Implemented |
MZ0261 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $466 | $0 | Implemented |
MZ0261 # 04 Y:2019 | 04 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $107,654 | $78,000 | Implemented |
MZ0261 # 05 Y:2019 | 05 | 2019 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $163 | $0 | Implemented |
MZ0261 # 06 Y:2019 | 06 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,011 | $14,440 | Not Implemented |
BS0116 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $113 | $50 | Implemented |
BS0116 # 02 Y:2019 | 02 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,415 | $1,176 | Not Implemented |
BS0116 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,158 | $13,685 | Not Implemented |
BS0116 # 04 Y:2019 | 04 | 2019 | USE EXISTING DAM TO GENERATE ELECTRICITY | $437 | $6,000 | Not Implemented |
BS0116 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,150 | $166,500 | Not Implemented |
SF0531 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $99,894 | $0 | Not Implemented |
SF0531 # 02 Y:2018 | 02 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $88,691 | $23,292 | Not Implemented |
SF0531 # 03 Y:2018 | 03 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,968 | $3,477 | Not Implemented |
SF0531 # 04 Y:2018 | 04 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,498 | $886 | Not Implemented |
SF0531 # 05 Y:2018 | 05 | 2018 | INSTALL STEAM TRAP | $9,614 | $6,613 | Not Implemented |
SF0531 # 06 Y:2018 | 06 | 2018 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $20,839 | $15,682 | Not Implemented |
SF0531 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,404 | $82,459 | Not Implemented |
SF0531 # 08 Y:2018 | 08 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $18,580 | $32,000 | Not Implemented |
SF0531 # 09 Y:2018 | 09 | 2018 | INCREASE AMOUNT OF CONDENSATE RETURNED | $15,854 | $35,361 | Not Implemented |
SD0574 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,259 | $0 | Implemented |