IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,961

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0704 # 03 Y:2013 03 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,329 $5,680 Not Implemented
MA0704 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $2,055 $5,900 Implemented
MA0704 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,765 $500 Not Implemented
MA0704 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $2,200 Not Implemented
MAS033 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,549 $7,500 Implemented
MAS033 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,256 $34,000 Not Implemented
MAS033 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,224 $730 Not Implemented
MAS033 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $3,450 Not Implemented
MAS031 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $42,399 $35,000 Not Implemented
MAS031 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,552 $150 Implemented
MAS031 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,640 $200 Not Implemented
MAS031 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,556 $900 Not Implemented
MAS031 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $593 $425 Implemented
MA0701 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,785 $80,000 Not Implemented
MA0701 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $12,823 $24,111 Not Implemented
MA0701 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $3,642 $6,000 Not Implemented
MA0701 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $9,553 $47,000 Implemented
MA0701 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $7,855 $11,200 Implemented
MA0701 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,286 $500 Implemented
MA0700 # 01 Y:2012 01 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $16,572 $12,830 Not Implemented
MA0700 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,586 $24,280 Implemented
MA0700 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $3,503 $500 Implemented
MA0700 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,265 $500 Implemented
MA0700 # 05 Y:2012 05 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,934 $500 Implemented
MA0700 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,148 $500 Implemented