Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,004
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0031 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,430 | $0 | Not Implemented |
DL0031 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,757 | $0 | Not Implemented |
DL0031 # 09 Y:2008 | 09 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,944 | $7,500 | Implemented |
DL0030 # 01 Y:2008 | 01 | 2008 | REPLACE BOILER | $5,600 | $0 | Not Implemented |
DL0030 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,055 | $25,852 | Implemented |
DL0030 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,623 | $5,306 | Implemented |
DL0030 # 04 Y:2008 | 04 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,890 | $7,500 | Not Implemented |
DL0030 # 05 Y:2008 | 05 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,675 | $0 | Implemented |
DL0030 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $120 | $140 | Implemented |
DL0029 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,200 | $500 | Not Implemented |
DL0029 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,326 | $4,000 | Implemented |
DL0029 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $44,793 | $11,000 | Implemented |
DL0029 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,724 | $75,600 | Not Implemented |
DL0029 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,700 | $3,250 | Not Implemented |
DL0027 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,800 | $0 | Implemented |
DL0027 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,691 | $27,814 | Not Implemented |
DL0027 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,514 | $52,000 | Implemented |
DL0024 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $160,536 | $150,000 | Not Implemented |
DL0024 # 02 Y:2008 | 02 | 2008 | REPLACE BOILER | $116,210 | $102,000 | Not Implemented |
DL0024 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,865 | $11,000 | Implemented |
DL0024 # 04 Y:2008 | 04 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,421 | $3,877 | Not Implemented |
DL0024 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $10,800 | $1,200 | Implemented |
DL0024 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,200 | $112,000 | Implemented |
DL0022 # 01 Y:2008 | 01 | 2008 | OPERATE BOILERS ON HIGH FIRE SETTING | $10,038 | $0 | Implemented |
DL0022 # 02 Y:2008 | 02 | 2008 | MINIMIZE WATER USAGE | $18,580 | $10,000 | Implemented |