IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0383 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,141 $200 Not Implemented
WV0383 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,008 $375 Implemented
WV0383 # 09 Y:2008 09 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,006 $2,125 Not Implemented
WV0383 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $1,995 Implemented
WV0383 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $655 $0 Implemented
WV0383 # 12 Y:2008 12 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $380 $800 Implemented
OR0541 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $277,000 $77,500 Implemented
OR0541 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,123 $8,200 Not Implemented
OR0541 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $10,377 $3,000 Not Implemented
OR0541 # 04 Y:2008 04 2008 UPGRADE CONTROLS ON COMPRESSORS $8,200 $8,200 Not Implemented
OR0541 # 05 Y:2008 05 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $18,926 $289,553 Not Implemented
OR0541 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $1,170 $5,250 Not Implemented
OR0541 # 07 Y:2008 07 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,386 $49,854 Not Implemented
TT0029 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,600 $12,000 Implemented
TT0029 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $52,700 $1,000 Implemented
TT0029 # 03 Y:2008 03 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,050 $2,000 Not Implemented
TT0029 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $1,060 $250 Not Implemented
TT0029 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $1,250 $250 Not Implemented
TT0029 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $2,000 Not Implemented
TT0029 # 07 Y:2008 07 2008 OPTIMIZE PLANT POWER FACTOR $4,855 $13,300 Implemented
IA0435 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,332 $252 Implemented
IA0435 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,663 $45 Not Implemented
IA0435 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $978 $240 Implemented
IA0435 # 04 Y:2008 04 2008 COVER OPEN TANKS $881 $225 Not Implemented
IA0435 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,079 $36,423 Not Implemented