IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,731

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0004 # 03 Y:2022 03 2022 USE PHOTOCELL CONTROLS $8,537 $4,050 Not Implemented
CI0004 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,843 $8,200 Not Implemented
CI0004 # 05 Y:2022 05 2022 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $4,787 $8,000 Not Implemented
CI0004 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $1,464 $2,000 Not Implemented
UA0263 # 01 Y:2022 01 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $474,477 $2,321,152 Not Implemented
UA0263 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $75,936 $24,406 Implemented
UA0263 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,564 $3,635 Implemented
UA0263 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,283 $500 Not Implemented
UA0263 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,315 $800 Not Implemented
UA0263 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $12,543 $6,630 Implemented
UA0263 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,323 $3,005 Implemented
UA0263 # 08 Y:2022 08 2022 USE PHOTOCELL CONTROLS $1,182 $2,240 Implemented
UA0263 # 09 Y:2022 09 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,119 $5,072 Implemented
IP0163 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $241 $0 Implemented
IP0163 # 02 Y:2022 02 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $24,564 $0 Not Implemented
IP0163 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,306 $3 Implemented
IP0163 # 04 Y:2022 04 2022 USE PHOTOCELL CONTROLS $2,682 $248 Implemented
IP0163 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $712 $72 Implemented
TR0028 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,361 $5,404 Not Implemented
TR0028 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,972 $3,155 Implemented
TR0028 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,119 $11,200 Not Implemented
TR0028 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,584 $602 Implemented
TR0028 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $787 $1,511 Implemented
IP0163 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,466 $3,681 Implemented
IP0163 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,570 $851 Implemented