IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0568 # 05 Y:1996 05 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,810 $8,400 Not Implemented
TN0568 # 06 Y:1996 06 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,739 $5,200 Not Implemented
TN0568 # 07 Y:1996 07 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $277 $0 Not Implemented
UF0137 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $21,085 $5,000 Not Implemented
UF0137 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,664 $350 Implemented
UF0137 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,358 $34,340 Not Implemented
UF0137 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $9,176 $14,000 Implemented
UF0137 # 05 Y:1996 05 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $600 $0 Not Implemented
UF0137 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $21,580 $0 Implemented
UF0137 # 07 Y:1996 07 1996 MINIMIZE WATER USAGE $3,477 $3,400 Not Implemented
UF0137 # 08 Y:1996 08 1996 METER WASTE WATER $1,788 $2,000 Implemented
SD0132 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,127 $12,660 Not Implemented
SD0132 # 02 Y:1996 02 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,412 $46,000 Not Implemented
SD0132 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,410 $450 Not Implemented
SD0132 # 04 Y:1996 04 1996 MODERATE COOLING TOWER OUTLET TEMPERATURE $318 $200 Not Implemented
SD0132 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,467 $2,141 Not Implemented
SD0132 # 06 Y:1996 06 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $6,700 $4,730 Not Implemented
SD0132 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $673 $517 Not Implemented
SD0132 # 08 Y:1996 08 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,683 $450 Not Implemented
SD0133 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,481 $7,830 Not Implemented
SD0133 # 02 Y:1996 02 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $631 $1,020 Not Implemented
SD0133 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,082 $2,568 Not Implemented
SD0133 # 04 Y:1996 04 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $2,366 $2,505 Not Implemented
SD0133 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $1,076 $1,034 Not Implemented
SD0133 # 06 Y:1996 06 1996 MODIFY MATERIAL APPLICATION METHODS $43,900 $1,000 Not Implemented